Squirrel Under-bed Storage

IMPORTANT: ASSEMBLE THE BED IN ITS FINAL POSITION
1. Follow the instructions for assembling a normal bed or four poster to the point where you have fixed in the side rails to the head and footboards.
THE SIDE RAILS ARE HANDED AND MARKED WITH A CODE:–
H.R. Headboard right
H.L. Headboard left
_SBP0132JE

Left and Right Squirrel Side Rails

2. Make sure you attach the rails to the correct side of the bed and your bed should now be recognizable with the spaces for the drawers showing.
The Head, Foot and Side Rails

The Head, Foot and Side Rails

3. Next you will need to screw in place the drawer runners for the Squirrel drawers to run on.
THE DRAWER RUNNERS ARE HANDED AND MARKED WITH A CODE:–
H.R. Headboard right
F.R. Footboard right
C.R. Centre right (Not shown: only on the 4 drawer version)
The drawer runners run across the width of the bed.
The Squirrel Drawer Runners

The Squirrel Drawer Runners

4. Pilot holes have been pre-drilled for the drawer runners to be positioned and fixed with a screw.
This can sometimes be a tight fit so look to line up the hole as the bed has already been assembled in the factory.
Piolet Holes in the Drawer Runners

Pilot Holes in the Drawer Runners

5. Fix the drawer runner marked H.R. at the right hand headboard corner of the bed.
Fix the runner marked F.R. at the right hand footboard corner of the bed.
If the bed has a four drawer unit fit the runner marked C.R. across the centre as this supports the inside drawer runners
Fixing the Runners in place

Fixing the Runners in place

6. The adjustable feet help keep the drawers running smoothly so adjust them to take out any sagging in the rail so the drawers are fully supported.
Adjusting the Running Foot

Adjusting the Running Foot

7. Each drawer is marked with a code. Put the drawers in the correct slot following the table below. Check that they run smoothly and are not obstructed.
THE DRAWERS ARE HANDED AND MARKED WITH A CODE
Two drawer unit
R. – Right hand side
L. – Left hand side
Four drawer unit
H.R. – Headboard right
H.L. – Headboard left
F.R. – Footboard right
F.L. – Footboard left
A Right handed drawer

A Right handed drawer

8. Set the drawer stops on the back of the drawer and fix the drawer stop in place with the screws provided while the drawer is in the frame.
Securing the Drawer back-stop

Securing the Drawer back-stop

9. Place the centre bar down the middle of the bed and the carefully lay out the webbed pack of slats.
The slats should sit on the bearers and the centre bar.
Fix the slats in place using a screws provided at each corner and down the centre bar.
Fixing the Centre slat

Fixing the Centre slat

Two drawer Sleigh Bed Squirrel and four drawer County Kerry Squirrel under-bed storage.
County Kerry with under bed drawers-openJE

Parisienne with under bed drawersJE

No Comments

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

WordPress Themes